SMART Integrated Drill and Splitter in Pune
One Excavator, Two Jobs, No Blasting
Large rock jobs usually run in two stages. A rig drills the holes, then a separate splitter comes in to open them. Every hand-off costs time, and every extra machine adds cost. A SMART Integrated Drill and Splitter in Pune puts both stages on one attachment, so a single excavator drills the hole and splits the rock without any blasting.
Here is how the SHIS series works, how to pick a size, and what to plan before it arrives on site.

What Is an Integrated Drill and Splitter?
Picture a rock drill and a hydraulic splitter built into one unit and fitted to an excavator. An Integrated Drill and Rock Splitter in Pune runs on the excavator's own hydraulic power, and an electro-hydraulic control system lets the operator switch between drilling and splitting. You do not need a separate drill to prepare the holes, and you do not need a second power unit on site.
Models at a Glance
The SHIS series comes in four sizes, named after their drilling diameter:
| SHIS-76 | 76 mm drilling diameter |
|---|---|
| SHIS-115 | 115 mm drilling diameter |
| SHIS-130 | 130 mm drilling diameter |
| SHIS-152 | 152 mm drilling diameter |
Smaller bores suit lighter rock and smaller carriers, while the wider bores are meant for heavier excavation. All four follow the same idea: drill, split and move on.
How the Machine Works
The operator positions the attachment and drills a hole into the rock. Without changing machines, the wedge set then goes into the same hole. Hydraulic pressure drives a centre wedge between two counter wedges, the wedges press on the hole walls, and a crack runs through the rock along your planned line. This Rock Drilling and Splitting Machine in Pune then moves to the next hole, all from the excavator cab.
A typical cycle looks like this:
- Position the excavator and mark the splitting line.
- Drill the hole with the attachment.
- Switch to splitting and apply pressure until the rock opens.
- Move to the next hole and repeat.
Where You Can Use It
An Excavator Mounted Drill and Splitter in Pune is made for hard rock jobs where blasting is restricted or unsafe:
Why One Machine Makes Sense
When drilling and splitting are done by different machines, each one waits for the other. A drill rig sits idle while the splitter works, and the splitter waits for new holes. With an integrated unit, the excavator goes straight to the next hole as soon as the last one has split. That cuts idle time, trims the crew and frees up space on a crowded site.
It also simplifies logistics. One attachment means one set of spares, one maintenance routine and one operator to train.
Planning the Job
Walk the area first and mark the splitting lines. Plan the holes towards a free face, because the rock needs somewhere to move as it opens. Set the spacing to suit the rock thickness, and keep the access route clear so loaders and trucks can remove the broken rock without delay. When drilling, splitting and hauling are scheduled together, the machine spends its day working, not waiting.
Common Mistakes to Avoid
Safety Tips
Care and Maintenance
Drilling is hard on tools, so check the drill parts at the start of every shift and keep spares on site. Clean the wedge set after use, inspect hoses and couplings, and look for oil leaks around the attachment. Store it dry and supported. A few minutes of checking prevents most stoppages.
Choosing the Right Size
Start with the rock and the hole you need. For lighter work and tighter sites, SHIS-76 is the practical choice. For harder rock and bigger excavations, SHIS-115, SHIS-130 and SHIS-152 give you a wider bore. Whatever you choose, make sure the excavator can carry the attachment and supply the hydraulic flow it needs. The manufacturer can tell you the matching carrier size for each model.
Buying from a Pune Manufacturer
When you look for an Integrated Rock Splitting Machine in Pune, ask about the matching excavator size, hydraulic requirements and the availability of drill parts and spares. A manufacturer close to your site can answer these questions quickly and respond faster when service is needed. That matters most on long projects, where a few days of downtime can cost more than the attachment.